Requested Shutdown - Bldg. 6 - floors 1 through 4

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Aug 27 10:53:29 1996

Date: Tue, 27 Aug 1996 10:48 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: schedule@MIT.EDU, adams@mitlns.mit.edu, karensal@MIT.EDU, acherron@MIT.EDU,
        edc@MIT.EDU, elp@MIT.EDU, farideh@MIT.EDU, shutdowns@MIT.EDU
X-Envelope-To: acherron@mit.edu, edc@mit.edu, elp@mit.edu, farideh@mit.edu,
 karensal@mit.edu, schedule@mit.edu, shutdowns@mit.edu
X-Vms-To: 
 IN%"schedule@mit.edu, adams@mitlns.mit.edu, karensal@mit.edu, acherron@mit.edu,
    edc@mit.edu, elp@mit.edu, farideh@mit.edu, shutdowns@mit.edu"

The following requested shutdown is for your review and information.
Would you please let me know if this shutdown is either acceptable or
unacceptable.

Thanks very much.

Andrea Nichols
Operations Center
8-6651

Building:       6 - 1st through 4th floors
System:         Fan supply, Air Handler 2 - PM#703204 - located in 6-030
Date:           9/3/96
Day:            Tuesday
Time:           1:00 PM - 6:00 PM
Duration:       5 hours
Reason:         Replace bearings and shaft
Effect:         Loss of supply ventilation and supply cooling during
                shutdown period