[34222] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Re: Requested Shutdown - Bldg. 54 - North Zone

daemon@ATHENA.MIT.EDU (Aran M. Parillo)
Fri Aug 2 11:56:21 1996

Date: Fri, 02 Aug 1996 11:56:53 -0400
To: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu, shutdowns@MIT.EDU, schedule@MIT.EDU,
        relices@MIT.EDU
From: "Aran M. Parillo" <aran@MIT.EDU>

Andrea, this is AOK with the Schedules Office.

Aran

At 09:11 AM 8/2/96 EDT, OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu wrote:
>The following materials which pertain to the requested shutdown of
>Building 54-North is for your review and information.  Would you
>please let me know if this shutdown is either acceptable or
>unacceptable.
>
>Thanks very much.
>
>Andrea Nichols
>8-6651 or return e-mail
>
>Building:       54 North Zone
>System:         Fan Supply - Air Handler 1
>Date:           8/7/96
>Day:            Wednesday
>Time:           8:00 AM - 3:00 PM
>Duration:       7 hours
>Reason:         Repair suction flex connection on AH-1
>Effect:         Loss of supply ventilation. Example of North Zone Rooms
>                would be 425 to 411; 527A to 533, etc.
>
>