Requested Shutdown - Bldg. 14 E

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Thu Aug 1 12:51:57 1996

Date: Thu, 1 Aug 1996 12:47 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU
X-Envelope-To: schedule@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, schedule@mit.edu"

The following which materials pertain to the requested shutdown of Bldg. 14
-E for Tues., 8/6 is for your review and information. Would you please
advise if this shutdown is either acceptable or unacceptable.

Thanks very much and I look forward to hearing from you.

Andrea Nichols
Operations Center
8-6651 or return e-mail

Building:       14 - E 3rd floor
System:         Electrical power
Date:           8/6/96
Day:            Tuesday
Time:           6:00 AM - 8:00 AM
Duration:       2 hours
Reason:         Construction
Effect:         Loss of all electrical power with the exception of
                emergency lights on the 3rd floor E only for 2 hours.
                Rooms that will be shutdown are:

                E304, 304A, 304B, 306, 310, 314, 314A, 316, 316A, 318,
                303, 303A, 303B and 311.