[34079] in Hotline Meeting
Request for Shutdowns - Bldg. 39 - 7/22 PM - 7/23 AM
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri Jul 19 11:28:22 1996
Date: Fri, 19 Jul 1996 11:24 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, mcgrath@mtl.mit.edu
X-Envelope-To: shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, mcgrath@mtl.mit.edu"
The following information which pertains to the requested shutdowns for
Building 39 are for your review and information Would you please let
me know either by return e-mail or telephone me at 8-6651 if these are
acceptable or unacceptable.
Thanks very much and I look forward to hearing from you.
Andrea Nichols
Operations Center
8-6651
Building: 39
System: Fan Exhaust Hoods
Date: 7/22 PM - 7/23 AM
Day: Monday PM - Tuesday AM
Time: 11:00 PM Monday - 6:00 AM Tuesday
Duration: 7 hours
Reason: Preventive maintenance work
Effect: Fan Exhaust Hoods to be off one at a time for one hour
each as follows:
PM#708631 #708650 #708633
Rm. 494 Rm. 487 Rm. 492
PM#708634 #708649 #708655
Rm. 180A Rm. 538 Rm. 242
P#708636
Rm. 558
Building: 39
System: Exhaust Hoods, Reverse Osmosis Pumps and Recirculating
Fan Coil Units with fans
Date: 7/22 PM - 7/23 AM
Day: Monday PM - Tuesday AM
Time: 11:00 PM (Monday) - 6:00 AM (Tuesday)
Duration: 7 hours
Reason: Preventive maintenance work
Effect: Hoods, Pumps and Fans down one at a time for 1 hour
each as follows:
PM#708638 #701197 #708653
Rm. 201, 201A Process Water Rm. 428
267A, 295 Reverse Osmosis
System
PM#708494 #708492 #708493
Rm. 297 Rm. 299A Rm. 299A
#708652 #701099
Rm. 566 Process Water (39-680)