[33431] in Hotline Meeting
Requested Emergency Shutdown - 1 -115 - 5/10 -
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri May 10 11:50:26 1996
Date: Fri, 10 May 1996 11:48 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: maryam@MIT.EDU, shutdowns@MIT.EDU
X-Envelope-To: maryam@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"maryam@mit.edu, shutdowns@mit.edu"
The following is an emergency shutdown request for Bldg. 1-115 for
today (5/10/96).
Would you please advise if this would be all right. I may be contacted
at 8-6615 or via return e-mail.
Maryam--I normally do not use email for emergency shutdowns, but you
were not in when I called (I left a voice mail message for you as
well).
Thanks and I look forward to hearing from you at your very earliest
convenience.
Andrea
Operations
Building: 1 - 115
System: Replace Motor in fan coil - supply-ventilation,supply
cooling.
Date: 5/10/96
Day: Friday
Time: 11:30 AM (hoped to be able to start work at this time)
to 5:00 PM or later depending upon start time.
Reason: Must replace motor in fn coil.
Effect: Loss of supply-ventilation and supply-cooling, although
there will be no impact to existing cooling.