Requested Critical Shutdown - Bldg. 10 - all

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri May 10 09:36:30 1996

Date: Fri, 10 May 1996 09:34 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU
X-Envelope-To: shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu"

The following pertains to the requested critical shutdown for Bldg. 10
for 5/15.

Please let me know if this is acceptable/unacceptable. I may be
contacted at 8-6651 or by return email.

Thanks.
Andrea
Operations

Building:       10 - All
System:         Hot and cold water
Date:           May 15, 1996
Day:            Wednesday
Time:           7:00 AM - 9:00 AM
Duration:       2 hours
Reason:         To repair broken pipe and bypass valve on booster pump.
Effect:         Loss of hot domestic, hot lab process water and cold
                domestic and cold lab process water.