The following pertains to the requested critical shutdown for Bldg. 10
for 5/15.
Please let me know if this is acceptable/unacceptable. I may be
contacted at 8-6651 or by return email.
Thanks.
Andrea
Operations
Building: 10 - All
System: Hot and cold water
Date: May 15, 1996
Day: Wednesday
Time: 7:00 AM - 9:00 AM
Duration: 2 hours
Reason: To repair broken pipe and bypass valve on booster pump.
Effect: Loss of hot domestic, hot lab process water and cold
domestic and cold lab process water.