[33344] in Hotline Meeting
requested Shutdown - Bldg. 16 - all third floor
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Mon May 6 11:08:30 1996
Date: Mon, 6 May 1996 11:05 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, opsnote@MIT.EDU, mmahoney@MIT.EDU, schedules@MIT.EDU,
manolis@MIT.EDU, Blair@mitvma.mit.edu, susang@MIT.EDU
X-Envelope-To: manolis@mit.edu, mmahoney@mit.edu, opsnote@mit.edu,
schedules@mit.edu, shutdowns@mit.edu, susang@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, opsnote@mit.edu, mmahoney@mit.edu, schedules@mit.edu, ma
nolis@mit.edu, Blair@mitvma.mit.edu, susang@mit.edu"
The following pertains to the requested shutdown for Bldg 16 - all
rooms - 3rd floor and is for your review and approval/disapproval. Would you
please advise me either via e-mail or call me at 8-6651 if this is
acceptable or unacceptable.
Thank you.
Andrea
Operations Center
Building: 16 - All Rooms - 3rd floor
System: Chilled Water
Date: 5/13/96
Day: Monday
Time: 7:00 AM - 3:00 PM
Duration: 8 hours
Reason: Repair to chilled water line.
Effect: No cooling for entire 3rd floor.