[32793] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Request for Critical Shutdown - E25

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Mon Apr 1 10:00:03 1996

Date: Mon, 1 Apr 1996 09:59 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, opsnote@MIT.EDU, e-zone@MIT.EDU, Rcoate@wccf.mit.edu,
        Scotts@MIT.EDU
X-Envelope-To: e-zone@mit.edu, opsnote@mit.edu, Scotts@mit.edu,
 shutdowns@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, opsnote@mit.edu, e-zone@mit.edu, Rcoate@wccf.mit.edu, Sc
   otts@mit.edu"

The following information pertains to the request for a critical
shutdown for E25. Please let me know either by return e-mail or call me
at 8-6651 if you forsee a problem with this.

Thanks.
Andrea

Building:       E-25 - Animal Quarters
System:         Air Handler 4 PM#707762 Supply Fan.
Date:           4/4/96
Day:            Thursday
Time:           7:30 AM - 11:30 AM
Duration:       4 hours
Reason:         Preheat coil leak (W.O.# issued to pipefitters to
                repair).
Effect:         Loss of supply-ventilation, cooling, heating and low
                pressure steam. *Exhaust fan will be operating during
                shutdown.


home help back first fref pref prev next nref lref last post