[32754] in Hotline Meeting
Reschedule of Shutdown for E19-all
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Thu Mar 28 12:30:41 1996
Date: Thu, 28 Mar 1996 09:28 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, Opsnote@MIT.EDU, e-zone@MIT.EDU, Kerryw@MIT.EDU,
Cbunker@MIT.EDU, Lambert@MIT.EDU, sdverify@MIT.EDU
X-Envelope-To: Cbunker@mit.edu, e-zone@mit.edu, Kerryw@mit.edu,
Lambert@mit.edu, Opsnote@mit.edu, sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, Opsnote@mit.edu, e-zone@mit.edu, Kerryw@mit.edu, Cbunker
@mit.edu, Lambert@mit.edu, sdverify@mit.edu"
The work to be done on the high voltage G & W isolator switches in the
electrical substation in E19 has to be rescheduled for one week later
because of additional preparation work. The new shutdown would be as follows:
Please advise me either by return e-mail or call me at 8-6651 if you
forsee a problem concerning this.
Thank you and I look forward to hearing from you.
Andrea
Building: E19 - all
Systems: All normal electric power & lights.
Date: 4/13/96
Day: Saturday
Time: 7:00 AM - 7:00 PM
Duration: 12 hours
Reason: To replace high voltage G & W isolator switches in the
electrical substation.
Effect: Loss of all power (with the exception of ATT phone room
power), chilled water, all air with the exception of
compressed lab air and lab vacuum air and loss of
condensate return.