Shutdown Request for Bldg. 68

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Mon Mar 25 15:37:32 1996

Date: Mon, 25 Mar 1996 15:37 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: Shutdowns@MIT.EDU, cus-coach@MIT.EDU
X-Envelope-To: cus-coach@mit.edu, Shutdowns@mit.edu
X-Vms-To: IN%"Shutdowns@mit.edu, cus-coach@mit.edu"


The following is a shut down request for Bldg. 68. Would you please
advise by email with a cc to IN%"sdverify@mit.edu" if this will be
acceptable.

Thanks and I look forward to hearing from you.
Andrea

Building:       68 - whole building
System:         all water
Date:           4/1/96
Day:            Monday
Time:           12:30 AM - 4:30 AM
Duration:       4 Hours
Reason:         To change valves on booster pumps.
Effect:         Loss of all hot domestic, hot lab process, cold
                domestic and cold lab process water during shutdown.