Shutdowns for 3/19, 3/20, 3/21 & 3/25

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Mon Mar 18 15:53:04 1996

Date: Mon, 18 Mar 1996 15:52 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, dcarlson@MIT.EDU, cappucci@MIT.EDU, me-all@MIT.EDU,
        sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, me-all@mit.edu,
 sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, dcarlson@mit.edu, cappucci@mit.edu, me-all@mit.edu, sdve
   rify@mit.edu"

The following shutdowns are for your information.

Critical
Building:       1 (all of building 1)
System:         Laboratory Air and gas
Date:           3/19/96
Day:            Tuesday
Hours:          9:00 AM - 11:00 AM
Duration:       2 hours
Reason:         Remove piping in demolition area in basement
Effect:         Loss of compressed lab air and natural gas

Critical
Building:       45 - Animal Quarters
System:         Air Handler 1 - roof (relates to AAALAC report)
Date:           3/20/96
Day:            Wednesday
Hours:          7:00 AM - 12 noon
Duration:       5 hours
Reason:         Main disc boot deteriorated--needs to be replaced by
                dome sheetmetal
Effect:         Shutdown of supply-ventilation, supply cooling, supply
                heating and exhaust-general.

Critical
Building:       68 - process hot water
System:         Tank #1, process hot water heater. Hot process water
                system will remain on line, heater #1 will not be available
                for back-up if #2 fails.
Date:           3/21/96
Day:            Thursday
Hours:          7:00 AM - 3:00 PM
Duration:       8 hours
Reason:         Patch liner - note confined space entry.
Effect:         Tank #1 process hot water heater. *Hot process water
                system will remain on line, heater #1 will not be available
                for backup if #2 fails.


Building:       54-328, 331, toilets and the recessed drinking fountain
                in corridor - 54-300 CA
System:         Hot and cold water. Also the cold water service to the
                drinking fountain. Note: valves orange tagged above
                ceiling men's room (54-331 are #44 and #42.)
Date:           3/25/96 - 3/29/96
Day:            Monday
Hours:          8:00 A - 3:00 PM
Duration:       5 days
Reason:         To renovate the mean's and women's toilets/drinking
                fountain (per ADA regulations).
Effect:         Loss of hot and cold domestic water for #328 & #331
                restrooms.