Shutdowns for 3/18, 3/19 & 3/21

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri Mar 15 14:03:02 1996

Date: Fri, 15 Mar 1996 14:02 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: Shutdowns@MIT.EDU, Dcarlson@MIT.EDU, Cappucci@MIT.EDU, Lambert@MIT.EDU,
        Ops-note@MIT.EDU, sdverify@MIT.EDU
X-Envelope-To: Cappucci@mit.edu, Dcarlson@mit.edu, Lambert@mit.edu,
 Ops-note@mit.edu, sdverify@mit.edu, Shutdowns@mit.edu
X-Vms-To: 
 IN%"Shutdowns@mit.edu, Dcarlson@mit.edu, Cappucci@mit.edu, Lambert@mit.edu, Ops
   -note@mit.edu, sdverify@mit.edu"

The following shutdowns are for your information.

Critical
Building:       W31 - 3rd floor heat
System:         Heating hot water. Note:Shutdown will be rescheduled if outside
                temperature is less than 40 degrees
Date:           3/18/96
Day:            Monday
Time:           7:30 AM - 11:30 AM
Duration:       4 hours
Reason:         Unions on converter are leaking.
Effect:         No heating hot water.

Critical
Building:       68 - complete building
System:         De-ionized water
Date:           3/19/96
Day:            Tuesday
Time:           1:00 PM - 4:00 PM
Duration:       3 hours
Reason:         To repair bad leak on system piping.
Effect:         Shutdown of de-ionized water.

Building:       E19
System:         Hot water
Date:           3/21/96
Day:            Thursday
Time:           7:30 AM - 1:30 PM
Duration:       6 hours
Reason:         Tie in of new fixtures.
Effect:         Loss of hot water in all ladies' and mens' restrooms
                in E19.