[32450] in Hotline Meeting
Upcoming shutdown
daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Fri Mar 8 14:48:24 1996
Date: Fri, 8 Mar 1996 14:47 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: dcarlson@MIT.EDU, cappucci@MIT.EDU, cus-coach@MIT.EDU, sdverify@MIT.EDU,
shutdowns@MIT.EDU, opsnote@MIT.EDU
X-Envelope-To: cappucci@mit.edu, cus-coach@mit.edu, dcarlson@mit.edu,
opsnote@mit.edu, sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To:
IN%"dcarlson@mit.edu, cappucci@mit.edu, cus-coach@mit.edu, sdverify@mit.edu, sh
utdowns@mit.edu, opsnote@mit.edu"
Building: 2
System: Air handler 2
Date: 3/9/96
Day: Saturday
Time: 11 a.m. - 3 p.m.
Duration: 4 hours
Reason: To replace steam coil in AH2
Effect: Shutdown of this unit will affect air makeup
and possibly some cooling to labs.
Building: 1-1, rooms on side of corridor beginning with
1-143 and stretchingto 1-169
System: Building power, lighting
Date: 3/12/96
Day: Tuesday
Time: 6 a.m. - 6:30 a.m.
Duration: 1/2 hour
Reason: To reverse phase rotation in a branch circuit panel
board
Effect: Loss of building power and lighting to the above
rooms forthe duration of the shutdown