[32400] in Hotline Meeting
Upcoming Shutdowns
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Mar 5 16:06:56 1996
Date: Tue, 5 Mar 1996 16:05 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, Dcarlson@MIT.EDU, Cappucci@MIT.EDU, e-zone@MIT.EDU,
Rcoate@wccf.mit.edu, me-all@MIT.EDU, sdverify@MIT.EDU
X-Envelope-To: Cappucci@mit.edu, Dcarlson@mit.edu, e-zone@mit.edu,
me-all@mit.edu, sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, Dcarlson@mit.edu, Cappucci@mit.edu, e-zone@mit.edu, Rcoa
te@wccf.mit.edu, me-all@mit.edu, sdverify@mit.edu"
Listed below are shutdowns for your information. If you have any
question, please feel free to contact me. Andrea
Building: 38
System: Supply Fan 2B and 3A
Date: 3/10 & 3/11/96
Day: Sunday and Monday
Time: 11:00 PM (Sun.) - 7:00 AM (Mon.)
Duration: 8 Hours
Reason: Preventive maintenance work
Effect: PM# 701947-SF2B srvices ventilationn/heat/cooling for
floors 1-6N; PM#701939 --SF3A services ventilation/heat/cooling
for
floors 1-6S; PM#701941 - SF1 services Basement ventilation.
Building: 11
System: Air Handler 2 and Roof Fan 2
Date: 3/8/96
Day: Friday
Time: 5:00 AM- 7:00 AM
Duration: 2 hours
Reason: Preventive maintenance work
Effect: PM# 703607 and 703606 services 3rd floor
ventilation/heat and cooling.
Building: E17-133
System: Fume exhaust hood fan (PM#700359 - Penthouse)
Date: March 19, 1996
Day: Tuesday
Time: 7:30 AM - 3:00 PM
Duration: 7.5 hours
Reason: Fume exhaust hood control modification. Exhaust valve
damper to replace V. F. D.
Effect: Loss of hood.
Building: E25
System: Fan Hood Exhausts -time down up to 1 hour each.
Date: 3/11-12/96
Day: Monday and Tuesday
Time: 11:00 PM (Mon.) - 7:00 AM (Tues.)
Duration: 8 Hours
Reason: Preventive Maintance Work
Effect: PM#707853 services Rm. 649, #707851 serv. 344, #707849
serv. 548, #707847 serv. 445, #707846 serv. 345, #707854
serv. 550, #707855 serv. 345, #707856 serv. 250A&B, #707817
serv. 325, #707816 serv. 230, #707810 serv. 325, 707809 serv.
627, 707808 serv. 621W, 707807 serv. 326,707805 serv. 421,
707804 serv. 621E.
Building: E25
System: Fan Exhaust Hoods - time down up to 1 hour each
Date: 3/12 - 13/96
Day: Tuesday and Wednesday
Time: 11:00 PM (Tues.) - 7:00 AM (Wed.)
Duration: 8 Hours
Reason: Preventive Maintenance Work
Effect: PM#707827 serv. Rm. 533, #707826 svc. 537, #707825
serv. 633, #707824 serv. 529, #707821 serv. 446B, #707820 serv.
626,#707819 serv. 429, #707818 serv. 629, 707836 serv. 530, 707
835 serv. 642 A,B & C, 707834 serv. 637, 707833 serv. 028, 7078
32 serv. 438, 707831 serv. 633W, 707830 serv. 032, and 707828
serv. 534.
Building: 1 (Basement- d'arbeloff Lab area)
System: Domestic hot water--entire building all sinks
Date: 3/7/96
Day: Thursday
Time: 7:00 AM - 3:00 PM
Duration: 8 Hours
Reason: Renovations/demolition/removal--cut and cap water
lines.
Effect: Loss of hot water in entire building--all sinks only.
Building: 68
System: Air Handlers, Exhaust Fans
Date: 3/11/96
Day: Monday
Time: 3:00 PM - 11:00 PM
Duration: 8 Hours
Reason: Preventive Maintenance Work
Effect: AH4 services AQ - all exhaust fans service AQ hoods:
Back-up from AH1, 2 & 3 will supply heating, ventilation & air
conditioning (HVAC) air while AH4 is off.
Building: 68-284 (Hot Lab)
System: Exhaust Hood #716566.
Date: 3/12/96
Day: Tuesday
Time: 7:30 AM - 11:30 AM
Duration: 4 hours
Reason: Bearings on fan starting to fail (need to be changed).
Effect: Loss of exhaust-laboratory air.