Shutdowns for 2/26 & 2/29/96
daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Fri Feb 23 16:11:06 1996
Date: Fri, 23 Feb 1996 16:10 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, dcarlson@MIT.EDU, cappucci@MIT.EDU, sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, sdverify@mit.edu,
shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu", IN%"dcarlson@mit.edu", IN%"cappucci@mit.edu",
IN%"sdverify@mit.edu"
The following pertains to information about the shutdowns for W51 and
Building 14.
Critical
Building: W51 (Burton-Conner House)
System: Heating Systems
Date: 2/26/96
Day: Monday
Time: 9:00 AM - 2:00 PM
Duration: 5 Hours
Reason: TO REPLACE 4 RADIATOR VALVES
Effect: Loss Of Heating Hot Water
Building: 14, Room 0330 (stack reading room).
System: High pressure condensate, return to main
Date: 2/29/96
Day: Thursday
Time: 5:00 PM - 12 PM
Duration: 7 hours
Reason: To replace 10 foot section of pipe. If outside
temperature is 25, may not be able to do.
Effect: Loss of steam. There will be cutting and welding. There
may be noise and some odor.