[31682] in Hotline Meeting

home help back first fref pref prev next nref lref last post

cluster closings and server shutdowns for next week

daemon@ATHENA.MIT.EDU (Jonathon Weiss)
Fri Jan 19 19:59:58 1996

From: Jonathon Weiss <jweiss@MIT.EDU>
To: athena-outage@MIT.EDU
Date: Fri, 19 Jan 1996 19:59:34 EST


The short version (in the motd):

Cluster closings and server shutdowns during the third week of IAP.
37-318 and 37-332: Sat. 1/20 from 9AM until 1PM
37-312: Sun. 1/21 from 9AM until 2PM
38-370:	from Mon.   1/22 5PM until Tues.  1/23 noon
37-321, 37-318, 37-332: from Tues.  1/23 4PM until Wed.   1/24 8AM
e51-090:from Wed.   1/24 4PM until Thurs. 1/25 8AM

Server Hera
	between 1:00 AM and 3:00 AM Wed. 1/24/96 (Tues. night)
Servers Typhoeus, Tartarus
	between 1:00 AM and 3:00 AM Thurs. 1/25/96 (Wed. night)

For more details please do the following:
        attach info; more /mit/info/Shutdowns-IAP-week3



The long version (/mit/info/Shutdowns-IAP-week3):

There will be many Cluster closings and server shutdowns over IAP.
This is a list of the shutdowns scheduled for the third week of
IAP (Sat. 1/20/96 - Fri. 1/26/96).


37-318 and 37-332: Sat. 1/20 from 9AM until 1PM
37-312: Sun. 1/21 from 9AM until 2PM

These clusters will be closed for preventative maintenance.


38-370:	from Mon.   1/22 5PM until Tues.  1/23 noon
37-321, 37-318, 37-332:	from Tues.  1/23 4PM until Wed.   1/24 8AM
e51-090:from Wed.   1/24 4PM until Thurs. 1/25 8AM

These clusters will be closed for cleaning.



Server Hera
	between 1:00 AM and 3:00 AM Wed. 1/24/96 (Tues. night)

This server will be shutdown for a software upgrade, and so it can be
moved onto a UPS (uninterruptable power supply).  It is not expected
that is will be down for the entire duration of the shutdown, but it
may be.

While it is down all lockers on it will be unavailable.
To find out if a locker you use is affected:

		% add consult
		% lookup <lockername>
	Filesystem <lockername> (AFS) is located on:
	Server-name.MIT.EDU (read-write)


Servers Typhoeus, Tartarus
	between 1:00 AM and 3:00 AM Thurs. 1/25/96 (Wed. night)

These servers will be shutdown so they can be moved onto a UPS
(uninterruptable power supply).  In addition Tartarus will receive a
software upgrade.  It is not expected that all of the servers will be
down for the entire duration of the shutdown, but any of them may be
down at any point during the specified time period.

		% add consult
		% lookup <lockername>
	Filesystem <lockername> (AFS) is located on:
	Server-name.MIT.EDU (read-write)

home help back first fref pref prev next nref lref last post