Bldg. 2 shutdown

daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Fri Jan 19 08:27:43 1996

Date: Fri, 19 Jan 1996 08:28 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, cappucci@MIT.EDU, dcarlson@MIT.EDU, opsnote@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, opsnote@mit.edu,
 sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu", IN%"cappucci@mit.edu",
 IN%"dcarlson@mit.edu",IN%"opsnote@mit.edu"

Following are notifications of upcoming shutdowns:

Building:       2 (see below for more complete details)
System:         Electric power and lighting
Date:           1/27/96
Day:            Saturday
Time:           7 a.m. - 7 p.m.
Duration:       12 hours
Reason:         To replace a circuit breaker panel on the third floor
Effect:         Loss of building power/lights to the southern section
                of Bldg. 2 (the side facing Memorial Drive) starting
                at -052, -146, -246, -348 for the duration of the shutdown.