Bldgs 3, 8, and 68 shutdowns

daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Tue Jan 16 11:12:56 1996

Date: Tue, 16 Jan 1996 11:13 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, dcarlson@MIT.EDU, cappucci@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, sdverify@mit.edu,
 shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu", IN%"dcarlson@mit.edu", IN%"cappucci@mit.edu"

Following are notifications of upcoming shutdowns:

Building:       3 and 8
System:         3 - electric power and lighting; 8 - 480 volt lab power
                ONLY
Date:           1/20/96
Day:            Saturday
Time:           7 a.m. - 3 p.m.
Duration:       8 hours
Reason:         To replace faulty 2400 volt primary power cable
Effect:         Loss of power and air supply systems (ventilation,
                cooling, exhaust; lab exhaust, general exhaust,
                toilet exhaust) to building 3; loss of 480v lab power
                to building 8

Building:       68
System:         Medium pressure steam, fire alarm and smoke detectors
Date:           1/18/96
Day:            Thursday
Time:           3 p.m. - 11 p.m.
Duration:       8 hours
Reason:         To repair leak on main supply to cage washer
Effect:         Loss of medium pressure steam, fire alarm and smoke
                detector systems for the duration