Re: Building 11 Fish Bowl
daemon@ATHENA.MIT.EDU (Jerry Burke)
Mon Dec 11 13:33:47 1995
Date: Mon, 11 Dec 1995 13:33:36 -0500
To: Stephen B.Goldman <sgoldman@tcm.mit.edu>
From: burke@MIT.EDU (Jerry Burke)
Cc: hotline@MIT.EDU, bmurphy@MIT.EDU
> Brian,
> Can we talk about when I can get the cluster the install the
> twisted pair station cable?
Hi Steve,
I talked to Brian this morning 12/11. He said you could have Bldg. 11-113 and 116 closed for a few days the beginning of IAP. According to the IAP 1996 timetable that should start on Jan 8. So Brian said you can have the 8th, 9th and 10th of Jan. to complete this project, rooms will be closed. I don't know who Brian has assigned this too yet, but I will keep you posted.
Hi guys,
This is the project for converting the network from thinwire to UTPE.
Brian has the floor plans.
I have two projects that require this installation to get done on time.
The 5ess jacks to be installed number 30. The UTPE drops to be installed number 44.
Steve needs the dates JAN 8, 9 and 10 in order to run the wire and the drops.
This is the one for you to pay attention to and arrange for the closing of the Cluster for those dates. Brian has the details.
If you need further information, please let me know. Also please keep me informed.
Thanks, Jerry