SHUTDOWNS
daemon@ATHENA.MIT.EDU (Michael Smith)
Tue Sep 19 10:03:59 1995
Date: Tue, 19 Sep 1995 10:00 EDT
From: Michael Smith <MSMITH%MITPPL.bitnet@mitvma.mit.edu>
To: SHUTDOWNS@MIT.EDU, OPSNOTE@MIT.EDU
X-Envelope-To: OPSNOTE@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: IN%"SHUTDOWNS@MIT.EDU",IN%"OPSNOTE@MIT.EDU"
From: PPL::MSMITH "Michael Smith" 19-SEP-1995 09:23:15.61
To: IN%"PLANT-SHUTDOWN@MIT.EDU",IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU"
CC: IN%"SDVERIFY@MIT.EDU",MSMITH
Subj: SHUTDOWNS
ROUTINE
BUILDING: W20-575A
SYSTEM: ATHENA COOLING UNIT
DATE: 9-25-95
DAY: MONDAY
TIME: 9:00 A.M. - 12:00 P.M.
DURATION: 3 HOURS
REASON: REPAIR SHEAVES ON FAN
EFFECT: SUPPLY-COOLING
ROUTINE
BUILDING: NW12 - VARIOUS ROOMS 1ST 2ND AND 3RD FLOORS
SYSTEM: EXHAUST,GENERAL,TOILET, & FAN COIL UNITS
DATE: 9-26-95
DAY: TUESDAY
TIME: 7:30 A.M. - 7:30 P.M.
DURATION: 12 HOURS
REASON: P.M.'S
EFFECT: SUPPLY - COOLING & HEATING,
EXHAUST - LABORATORY, GENERAL & TOILET
CRITICAL**
BUILDING: NW61
SYSTEM: LOW PRESSURE STEAM
DATE: 9-19-95
DAY: TUESDAY
TIME: 12:00 P.M. - 4:00 P.M.
DURATION: 4 HOURS
REASON: REPLACE VALVE
EFFECT: HEATING
CRITICAL**
BUILDING: 24
SYSTEM: CHILLED WATER
DATE: 9-21-95
DAY: THURSDAY
TIME: 7:30 A.M. - 9:30 A.M.
DURATION: 2 HOURS
REASON: REPAIR LEAK
EFFECT: COOLING