| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
To: Hotline@MIT.EDU Cc: sdverify@MIT.EDU, degoulet@MIT.EDU Date: Thu, 17 Aug 95 07:46:23 From: degoulet@MIT.EDU (Doug Goulet ) 8-17-95 Physical plant would like to schedule a sprinkler shutdown in building 2. The preferred date is Tuesday 8/22/95. The shutdown would last from 7:30 am to 3:00 pm. Thanks- Doug Goulet
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |