[29477] in Hotline Meeting
1-115 Shutdown
daemon@ATHENA.MIT.EDU (John J Morey)
Tue Aug 15 07:31:07 1995
To: dcns-cluster@MIT.EDU, hotline@MIT.EDU
Cc: nschmidt@MIT.EDU, maryam@MIT.EDU
Date: Tue, 15 Aug 1995 06:50:07 EDT
From: John J Morey <jjmorey@MIT.EDU>
Hi-
Over the next 3 weekends or so there will be power shutdowns
in bldg. 1. 1-115 can be shutdown on 8/17 to start the system
swap's, we will need to make sure that the new equipment is
powered down on the Friday's before the shutdowns.
--------------------------------------------------------------------------------
From: CVENEZIA%MITPPL.bitnet@mitvma.mit.edu
*I HAD RECENTLY SEND YOU EMAIL ON A POWER SHUTDOWN THAT WILL TAKE PLACE
ON 2 CONSECUTIVE SATURDAYS. THE ELEC. SHOP FOUND THAT THIS SHUTDOWN
WILL NEED TO BE DONE 3 CONSECUTIVE SATURDAYS (08-12, 08-19 AND 08-26).
THE INFO AND AREA'S AFFECTED ARE AS FOLLOWS.
BUILDINGS: 1, 3, 8 AND 5
SYSTEMS: ELEC. POWER AND LIGHTING
DATE: 08-12-95, 08-19-95 AND 08-26-95
DAY: SATURDAYS
TIME: 7AM UNTIL 11PM
DURATION: 16 HOURS
REASON: CONSTRUCTION
EFFECT: ALL POWER IN BLDG. 1, ALL POWER IN BLDG. 3, BLDG. 8
(480V) LAB POWER AND BLDG. 5-234.
POWER ONLY AND BUILDING 5-234 (CLASSROOM). ALL POWER
INCLUDES ELEVATORS, LIGHTING, COMPUTERS, CHILLED WATER
(AC COOLING), SUPPLY VENTILATION, SUPPLY COOLING, LAB
EXHAUST, GENERAL EXHAUST AND TOILET ROOM EXHAUST.
--------------------------------------------------------------------------------
_=____________________________-
/ //// (_JJ_) ______ |
********************** (_|_////________________(_______|
John Morey )/ /)( )/_)_)_)_)_)_))
Athena Customer Service Rep (/ o /)__\__))
jjmorey@mit.edu (/ /)
253-6367 (/ /)
********************** (/ /)
(/_ o _/)
---------
Don't end up as Road Kill along the Information Super Highway