[29471] in Hotline Meeting
Re: E-40 3rd Floor electrical shutdown
daemon@ATHENA.MIT.EDU (Jeffrey I. Schiller)
Mon Aug 14 16:22:16 1995
Date: Mon, 14 Aug 1995 16:20:27 -0400
To: degoulet@MIT.EDU
From: jis@MIT.EDU (Jeffrey I. Schiller)
Cc: network@MIT.EDU, op@MIT.EDU, hotline@MIT.EDU, janb@MIT.EDU,
sdverify@MIT.EDU, ljr@MIT.EDU
>Physical plant needs to schedule a shutdown of electrical power in the 3rd
>floor of E40 on August 22, 1995. The shutdown will occur between 6:00 am
>and 8:00 am. The reason for this shutdown is to connect a new power panel
>to the transformer. The panel is for renovations which are occuring in the
>Energy Lab and Information Servives.
>
>Is this schedule acceptable?
Not exactly. We need to discuss providing emergency power to some locations
on the floor (which provide critical network services) prior to the
scheduling of this shutdown. If we can get the power we need prior to
Tuesday, great, otherwise we are going to have to postpone this one.
-Jeff