8-14-95
Physical plant needs to schedule a shutdown of electrical power in the 3rd
floor of E40 on August 22, 1995. The shutdown will occur between 6:00 am
and 8:00 am. The reason for this shutdown is to connect a new power panel
to the transformer. The panel is for renovations which are occuring in the
Energy Lab and Information Servives.
Is this schedule acceptable?
Thanks-
Doug Goulet