E-40 3rd Floor electrical shutdown

daemon@ATHENA.MIT.EDU (Doug Goulet )
Mon Aug 14 12:54:26 1995

To: Hotline@MIT.EDU
Cc: sdverify@MIT.EDU, degoulet@MIT.EDU, janb@MIT.EDU
Date: Mon, 14 Aug 95 12:54:46
From: degoulet@MIT.EDU (Doug Goulet )

8-14-95

Physical plant needs to schedule a shutdown of electrical power in the 3rd 
floor of E40 on August 22, 1995.  The shutdown will occur between 6:00 am 
and 8:00 am.  The reason for this shutdown is to connect a new power panel 
to the transformer.  The panel is for renovations which are occuring in the 
Energy Lab and Information Servives. 

Is this schedule acceptable?

Thanks-
Doug Goulet