SHUTDOWNS

daemon@ATHENA.MIT.EDU (CVENEZIA%MITPPL.bitnet@mitvma.mit.)
Wed Aug 2 11:36:34 1995

Date: Wed, 2 Aug 1995 10:09 EDT
From: CVENEZIA%MITPPL.bitnet@mitvma.mit.edu
To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, SHUTDOWNS@MIT.EDU, OPSNOTE@MIT.EDU,
        SDVERIFY@MIT.EDU
X-Envelope-To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, OPSNOTE@MIT.EDU,
 SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: 
 IN%"CAPPUCCI@MIT.EDU",IN%"DCARLSON@MIT.EDU",IN%"SHUTDOWNS@MIT.EDU",IN%"OPSNOTE@
   MIT.EDU",IN%"SDVERIFY@MIT.EDU"

BUILDING        -       E23
SYSTEM          -       SUPPLY FAN 8 AND RETURN FAN 8
DATE            -       08-03-95
DAY             -       THURSDAY (TOMORROW)
TIME            -       7AM UNTIL 9AM
DURATION        -       2 HOURS OR LESS
REASON          -       REPLACING FREEZE STAT
EFFECT          -       AIR SUPPLY FOR FLOORS 1-6

BUILDING        -       E23
SYSTEMS         -       AIR HANDLER 11, 10, 9 AND 8
DATE            -       08-04-95
DAY             -       FRIDAY
TIME            -       8:30 UNTIL 11:30
DURATION        -       45 MINUTES EACH UNIT
REASON          -       CHANGING PRE AND FINAL FILTERS
EFFECT          -       BASEMENT THRU THE 5TH FLOOR
                        VENTILATION/COOLING - EACH FAN WILL BE OFF FOR
                        45 MINUTES.

BUILDING        -       W34-
SYSTEM          -       EXHAUST FAN
DATE            -       08-04-95 (FRIDAY)
TIME            -       7:30AM UNTIL 12:30PM
DURATION        -       5 HOURS
REASON          -       REPLACING SHEAVE AND BELT
EFFECT          -       EXHAUST FOR LOCKER AND PUBLIC ROOMS

BUILDING        -       4-205 AND 205B
SYSTEM          -       AIRHANDLER #2
DATE            -       08-04-95
DAY             -       FRIDAY
TIME            -       7:30AM UNTIL 10:30AM
DURATION        -       3 HOURS
REASON          -       INSTALL GREASE FITTINGS
EFFECT          -       SUPPLY VENTILATION AND SUPPLY COOLING FOR ROOMS
                        205 & 205B.

BUILDINGS       -       1, 3 AND 8
SYSTEM          -       ELEC. POWER AND LIGHTING
DATE            -       08-12-95 AND 08-19-95 (SAME SHUTDOWN BOTH DAYS)
DAY             -       SATURDAY
TIME            -       7AM UNTIL 11PM
DURATION        -       16 HOURS
REASON          -       CONSTRUCTION
EFFECT          -       *BUILDING 1 - ALL POWER AND LIGHTING
                        *BUILDING 3 - ALL POWER AND LIGHTING
                        *BUILDING 8 - 480 VOLT LAB POWER ONLY


BUILDINGS       -       18
SYSTEM          -       EXHAUST FANS
DATE            -       08-18-95
DAY             -       FRIDAY
TIME            -       7:30AM UNTIL 3:30PM
DURATION        -       8 HOURS
REASON          -       BEARINGS NEED TO BE CHANGED
EFFECT          -       NO EXHAUST IN ROOMS 012, 021 AND 125


BUILDING        -       68
SYSTEM          -       ELECTRIC POWER AND LIGHTING
DATE            -       08-09-95 INTO 08-10-95
DAY             -       WEDNESDAY INTO THURSDAY
TIME            -       9PM WED. UNTIL 6AM THUR.
DURATION        -       9 HOURS
REASON          -       TESTING OF ELEC. SUBSTATION
EFFECT          -       POWER, BLDG. POWER, COMPUTERS, TELEPHONES,
                        LIGHTING, CHILLED WATER (COOLING), VENTILATION.


BUILDING        -       NW14
SYSTEM          -       FAN COIL UNITS (CHILLED WATER)
DATE            -       08-07-95
DAY             -       MONDAY
TIME            -       7:30AM UNTIL 12:30PM
DURATION        -       5 HOURS
REASON          -       REPLACEMENT OF ERIE VALVE
EFFECT          -       CHILLED WATER FOR FAN COIL UNITS (COOLING)

BUILDING        -       12
SYSTEM          -       FAN HOODS AND SUPPLY AIR
DATE            -       08-08-95
DAY             -       TUESDAY
TIME            -       02:00 UNTIL 06:00
DURATION        -       1 HOUR EACH FAN/HOOD
REASON          -       PREVENTIVE MAINTENANCE
EFFECT          -       RM 065 - HOOD #2 AND HOOD #3
                        ROOM 082 - FAN EXHAUST HOOD
                        SUPPLY AIR TO ROOMS 011 AND 012

BUILDING        -       E17
SYSTEM          -       FAN EX. HOODS
DATE            -       08-08-95
DAY             -       MONDAY EVE INTO TUES MORN
TIME            -       11PM MONDAY - 2AM TUESDAY
DURATION        -       1 HOUR EACH
REASON          -       PREVENTIVE MAINTENANCE
EFFECT          -       HOOD EXHAUST IN ROOMS 336, 329 AND 221

BUILDING        -       38
SYSTEM          -       SUPPLYFAN 3B
DATE            -       08-09-95
DAY             -       TUESDAY INTO WEDNESDAY
TIME            -       11PM - 00:30
DURATION        -       1 1/2 HOURS
REASON          -       PREVENTIVE MAINTENANCE WORK
EFFECT          -       SOUTH OFFICE VENTILATION FLOORS 1-6

BUILDING        -       E15
SYSTEM          -       AH1 SUPPLY AND RETURN FANS 1A AND 1B
DATE            -       08-09-95
DAY             -       WEDNESDAY
TIME            -       00:30 - 07:00AM
DURATION        -       1 1/2 HOURS EACH
REASON          -       PREVENTIVE MAINTENANCE WORK
EFFECT          -       ENTIRE BUILDING VENTILATION AND EXHAUST

BUILDING        -       W4 (MCCORMICK HALL)
SYSTEM          -       DOMESTIC COLD WATER
DATE            -       08-07-95
DAY             -       MONDAY
TIME            -       9AM - 3PM
DURATION        -       6 HOURS
REASON          -       CHANGING WATER SUPPLY - RELOCATING WATER COOLER
EFFECT          -       NO DOMESTIC WATER IN BLDG.