[29170] in Hotline Meeting

home help back first fref pref prev next nref lref last post

CANCELLATION OF SHUTDOWN IN BUILDING 12

daemon@ATHENA.MIT.EDU (MFILES%MITPPL.bitnet@mitvma.mit.ed)
Mon Jul 17 16:23:16 1995

Date: Mon, 17 Jul 1995 16:18 EDT
From: MFILES%MITPPL.bitnet@mitvma.mit.edu
To: DCARLSON@MIT.EDU, CAPPUCCI@MIT.EDU, SHUTDOWNS@MIT.EDU, OPSNOTE@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, OPSNOTE@MIT.EDU,
 SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: 
 IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU",IN%"SHUTDOWNS@MIT.EDU",IN%"OPSNOTE@
   MIT.EDU"

THE FOLLOWING SHUTDOWN HAS BEEN CANCELLED:

        BUILDING:               12
        SYSTEM:                 ELECTRIC POWER
        DATE:                   7/18/95
        DAY:                    TUESDAY
        TIME:                   7:00 AM - 3:00 PM
        DURATION:               8 HOURS
        REASON:                 TO REMOVE EXISTING PANEL AND INSTALL
                                NEW ELECTRIC PANEL
        EFFECT:                 NO ELECTRICAL POWER TO THE 1ST FLOOR
                                AND MECHANICAL PENTHOUSE AREA.


******************************************************************************

THIS SHUTDOWN WILL BE RESCHEDULED FOR A FUTURE DATE.


home help back first fref pref prev next nref lref last post