Shutdown bldg. 12

daemon@ATHENA.MIT.EDU (Jason M. Roush)
Fri Jul 14 15:26:57 1995

Date: Fri, 14 Jul 1995 15:23 EDT
From: "Jason M. Roush" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: dcarlson@MIT.EDU, cappucci@MIT.EDU, shutdowns@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, sdverify@mit.edu,
 shutdowns@mit.edu
X-Vms-To: IN%"dcarlson@mit.edu",IN%"cappucci@mit.edu",IN%"shutdowns@mit.edu"

Following is a shutdown notification:

Routine

        Building:               12
        System:                 Electrical power
        Date:                   7/18/95
        Day:                    Tuesday
        Time:                   7:00 a.m. - 3:00 p.m.
        Duration:               8 hours
        Reason:                 Remove existing electrical panel
                                and install new panel
        Effect:                 No electrical power to 1st floor
                                and the mechanical penthouse area
                                for 8 hours