[29016] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Shutdown bldg. 38

daemon@ATHENA.MIT.EDU (Jason M. Roush)
Thu Jul 6 15:31:32 1995

Date: Thu, 6 Jul 1995 15:27 EDT
From: "Jason M. Roush" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu"

Following is a shutdown notification:

Routine

        Building:               38
        System:                 Chilled water
        Date:                   7/11/95
        Day:                    Tuesday
        Time:                   7:00 a.m. - 11:00 p.m.
        Duration:               16 hours
        Reason:                 Repairs
        Effect:                 No chilled water cooling in bldg.
                                for 16 hours (maybe less)


FYI--All contacts in Electrical Engineering and Computer Science have
approved this shutdown.  Thanks!


home help back first fref pref prev next nref lref last post