[28953] in Hotline Meeting
Shutdown bldgs. 21, W20
daemon@ATHENA.MIT.EDU (Jason M. Roush)
Thu Jun 29 11:21:18 1995
Date: Thu, 29 Jun 1995 11:16 EDT
From: "Jason M. Roush" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: dcarlson@MIT.EDU, cappucci@MIT.EDU, shutdowns@MIT.EDU, opsnote@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, opsnote@mit.edu,
sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To:
IN%"dcarlson@mit.edu",IN%"cappucci@mit.edu",IN%"shutdowns@mit.edu",IN%"opsnote@
mit.edu"
Following are two shutdown notifications:
Routine
Building: 12
System: Electrical power
Date: 7/5/95
Day: Wednesday
Time: 7:00 a.m. - 3:00 p.m.
Duration: 8 hours
Reason: Installion of new electric panel
Effect: No electrical power to first floor
and mechanical penthouse area of bldg.
for 8 hours
Routine
Building: W20
System: Electrical power and lighting
Date: 7/15/95
Day: Friday - Saturday
Time: Midnight Fri. - 6:00 a.m. Sat.
Duration: 6 hours
Reason: Repairs
Effect: No electrical power to mechanical
equipment (pumps, fans, etc.),
Laverdies refrigeration equipment,
Project Athena cluster, air supply
and chilled water systems, lighting
and power on 4th and 5th floors,
Lobdell and food court area, passenger
elevators, or freight elevator #4