Shutdown bldg. E19

daemon@ATHENA.MIT.EDU (Jason M. Roush)
Wed Jun 21 15:04:54 1995

Date: Wed, 21 Jun 1995 15:00 EDT
From: "Jason M. Roush" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, opsnote@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: opsnote@mit.edu, sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu",IN%"opsnote@mit.edu"

Following are two shutdown notifications:

Routine

        Building:               E19
        System:                 Air handlers
        Date:                   6/24/95 - 6/25/95
        Day:                    Saturday - Sunday
        Time:                   6:30 a.m. (Sat.) - 6:00 p.m. (Sun.)
        Duration:               36 hours
        Reason:                 Asbestos abatement
        Effect:                 No air supply ventilation or cooling to
                                floors 6 & 7 for 36 hours


Routine

        Building:               E19
        System:                 Lighting and emergency lighting
        Date:                   6/24/95 - 6/25/95
        Day:                    Saturday - Sunday
        Time:                   6:30 a.m. - 6:00 p.m.
        Duration:               36 hours
        Reason:                 Asbestos abatement
        Effect:                 No lighting and emergency lighting in
                                700CA for 36 hours