Shutdown bldgs. 3, 7, W20

daemon@ATHENA.MIT.EDU (JASON M. ROUSH)
Wed May 24 09:54:43 1995

Date: Wed, 24 May 1995 09:48 EDT
From: "JASON M. ROUSH" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: SHUTDOWNS@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: IN%"SHUTDOWNS@MIT.EDU"

Following are five shutdown notifications:

Routine

        Building:               3 (will also affect 7-201 through 7-208
                                with the exception of 7-207)
        System:                 Chilled water
        Date:                   5/25/95
        Day:                    Thursday
        Time:                   7:30 a.m. - 11:30 a.m.
        Duration:               4 hours
        Reason:                 Renovation
        Effect:                 No cooling for 4 hours


Routine

        Building:               W20
        System:                 Electrical power
        Date:                   6/24/95 - 6/25/95
        Day:                    Saturday - Sunday
        Time:                   9:00 p.m. (Sat.) - 9:00 a.m. (Sun.)
        Duration:               12 hours
        Reason:                 Maintenance
        Effect:                 Brief power outages (1/2 hour or less)
                                for entire bldg. for 12 hours total;
                                emergency power will be on