Shutdown bldgs. E52, E40, 48

daemon@ATHENA.MIT.EDU (JASON M. ROUSH)
Tue May 23 15:15:16 1995

Date: Tue, 23 May 1995 15:04 EDT
From: "JASON M. ROUSH" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: SHUTDOWNS@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: IN%"SHUTDOWNS@MIT.EDU"

Following are three shutdown notifications:

Critical (reminder--left voice mail yesterday)

        Building:               E52
        System:                 Electrical power
        Date:                   5/25/95
        Day:                    Thursday
        Time:                   5:00 a.m. - 6:30 a.m.
        Duration:               1.5 hours
        Reason:                 Voltage throughout bldg. is too low
        Effect:                 No bldg. power or computers for 1.5
                                hours; most lighting will stay on

Routine

        Building:               E40 (rms. 351 - 361)
        System:                 Chilled water
        Date:                   5/25/95
        Day:                    Thursday
        Time:                   5:00 a.m. - 10:00 a.m.
        Duration:               5 hours
        Reason:                 Repair
        Effect:                 No air conditioning for 5 hours


Routine

        Building:               48
        System:                 Chilled water
        Date:                   5/30/95
        Day:                    Tuesday
        Time:                   7:30 a.m. - 10:30 a.m.
        Duration:               3 hours
        Reason:                 Repair
        Effect:                 No air conditioning in bldg. with the
                                exception of 3rd & 4th floor labs