Shutdown bldgs. E19, E51

daemon@ATHENA.MIT.EDU (OPCTEMP%MITPPL.bitnet@mitvma.mit.e)
Wed May 10 12:04:05 1995

Date: Wed, 10 May 1995 12:01 EDT
From: OPCTEMP%MITPPL.bitnet@mitvma.mit.edu
To: SHUTDOWNS@MIT.EDU, OPSNOTE@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: OPSNOTE@MIT.EDU, SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: IN%"SHUTDOWNS@MIT.EDU",IN%"OPSNOTE@MIT.EDU"

Following are two shutdown notifications:

Routine

        Building:               E19
        System:                 Air Handler B1, Air Handler B2,
                                Air Handler B3, Air Handler RF
        Date:                   5/13/95
        Day:                    Saturday
        Time:                   7:00 a.m. - 12:00 noon
        Duration:               5 hours
        Reason:                 Repairs
        Effect:                 No air supply fans, ventilation,
                                heating or cooling for 5 hours


Routine

        Building:               E51, Rms. 110B, 116, 118, 120, 122
        System:                 Air supply & ventilation
        Date:                   5/17/95
        Day:                    Wednesday
        Time:                   7:00 a.m. - 3:00 p.m.
        Duration:               8 hours total
        Reason:                 HVAC Re-design
        Effect:                 Occupants will be unable to use these
                                rooms for 8 hours total due to
                                operation; no ventilation, heating
                                or cooling in these rooms during these
                                8 hours.


home help back first fref pref prev next nref lref last post