Shutdown bldgs. 13, 66

daemon@ATHENA.MIT.EDU (OPCTEMP%MITPPL.bitnet@mitvma.mit.e)
Wed May 3 15:22:27 1995

Date: Wed, 3 May 1995 15:14 EDT
From: OPCTEMP%MITPPL.bitnet@mitvma.mit.edu
To: SHUTDOWNS@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: IN%"SHUTDOWNS@MIT.EDU"

From:   PPL::OPCTEMP       3-MAY-1995 15:05:10.32
To:     IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU"
CC:     OPCTEMP,IN%"SDVERIFY@MIT.EDU"
Subj:   Shutdown bldgs. 13, 66

Following are two shutdown notifications:

Routine

        Building:               13
        Systems:                General/fan hood exhausts
                                and chilled water circulators
        Date:                   5/8/95
        Day:                    Monday
        Time:                   11:00 p.m. Sun. - 7 a.m. Mon.
        Duration:               8 hours (1 hour each unit)
        Reason:                 Preventive maintenance
        Effect:                 No general/lab exhaust or cooling for
                                8 hours total


Routine

        Building:               66-080
        System:                 Terminal unit fan coil units
        Date:                   5/8/95
        Day:                    Monday
        Time:                   11:00 p.m. Sun. - 1:00 a.m. Mon.
        Duration:               2 hours (1 hour each unit)
        Reason:                 Preventive maintenance
        Effect:                 Cooling units will be shut off one at a time,
                                very little effect on room temperature