[28158] in Hotline Meeting
Shutdown bldgs. 13, 66
daemon@ATHENA.MIT.EDU (OPCTEMP%MITPPL.bitnet@mitvma.mit.e)
Wed May 3 15:22:27 1995
Date: Wed, 3 May 1995 15:14 EDT
From: OPCTEMP%MITPPL.bitnet@mitvma.mit.edu
To: SHUTDOWNS@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: IN%"SHUTDOWNS@MIT.EDU"
From: PPL::OPCTEMP 3-MAY-1995 15:05:10.32
To: IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU"
CC: OPCTEMP,IN%"SDVERIFY@MIT.EDU"
Subj: Shutdown bldgs. 13, 66
Following are two shutdown notifications:
Routine
Building: 13
Systems: General/fan hood exhausts
and chilled water circulators
Date: 5/8/95
Day: Monday
Time: 11:00 p.m. Sun. - 7 a.m. Mon.
Duration: 8 hours (1 hour each unit)
Reason: Preventive maintenance
Effect: No general/lab exhaust or cooling for
8 hours total
Routine
Building: 66-080
System: Terminal unit fan coil units
Date: 5/8/95
Day: Monday
Time: 11:00 p.m. Sun. - 1:00 a.m. Mon.
Duration: 2 hours (1 hour each unit)
Reason: Preventive maintenance
Effect: Cooling units will be shut off one at a time,
very little effect on room temperature