Shutdown E17 & E18

daemon@ATHENA.MIT.EDU (OPCTEMP%MITPPL.BITNET@mitvma.mit.e)
Mon May 1 09:28:38 1995

Date: Mon, 1 May 1995 09:26 EDT
From: OPCTEMP%MITPPL.BITNET@mitvma.mit.edu
To: DCARLSON@MIT.EDU, CAPPUCCI@MIT.EDU, SHUTDOWNS@MIT.EDU, OPSNOTE@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, OPSNOTE@MIT.EDU,
 SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: 
 IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU",IN%"SHUTDOWNS@MIT.EDU",IN%"OPSNOTE@
   MIT.EDU"

Following are two shutdown notifications:

Routine

        Building:               E17
        System:                 Electrical power
        Date:                   5/5/95
        Day:                    Friday
        Time:                   9:00 p.m. - 1:00 a.m. Sat.
        Duration:               4 hours
        Reason:                 Construction
        Effect:                 No electrical power for mechanical equipment
                                (elevators, chilled/hot water, all air systems)
                                for 4 hours

Routine

        Building:               E18
        System:                 Electrical power
        Date:                   5/5/95
        Day:                    Friday
        Time:                   9:00 p.m. - 1:00 a.m. Sat.
        Duration:               4 hours
        Reason:                 Construction
        Effect:                 No electrical power for mechanical
                                equipment (elevators, chilled/hot
                                water, all air systems) for 4 hours