[27971] in Hotline Meeting

home help back first fref pref prev next nref lref last post

SHUTDOWNS BLDG E17, E34, NW21

daemon@ATHENA.MIT.EDU (OPCTEMP%MITPPL.BITNET@mitvma.mit.e)
Thu Apr 20 13:57:34 1995

Date: Thu, 20 Apr 1995 13:54 EDT
From: OPCTEMP%MITPPL.BITNET@mitvma.mit.edu
To: DCARLSON@MIT.EDU, CAPPUCCI@MIT.EDU, SHUTDOWNS@MIT.EDU, OPSNOTE@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, OPSNOTE@MIT.EDU,
 SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To: 
 IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU",IN%"SHUTDOWNS@MIT.EDU",IN%"OPSNOTE@
   MIT.EDU"

THE FOLOWING ARE THREE ADDITIONAL SHUTDOWNS

ROUTINE

        BLDG:           E17
        SYSTEM:         ELECTRICAL POWER TO 480 VOLT FAN MOTOR CONTROL
                        CENTER
        DATE:           4/21/95
        DAY:            FRIDAY
        TIME:           6:30 AM - 8:30 AM
        DURATION:       2 HOURS
        REASON:         CONSTRUCTION
        EFFCT:          POWER TO CONTROL CENTER WILL BE DOWN, NO EFFECT
                        TO BULIDING OCCUPANTS.  SHUTDOWN OCCURING IN
                        CONSTRUCTION PORTION OF BLDG

        BLDG:           E34
        SYSTEM:         HEATED HOT WATER
        DATE:           4/21/95
        DAY:            FRIDAY
        TIME:           7:30 AM - 12:00 PM
        DURATION:       4.5 HOURS
        REASON:         REPAIR
        EFFECT:         NO HEATED HOT WATER TO BLDG E34

CRITICAL

        BLDG:           NW21
        SYSTEM:         AIR HANDLER 1
        DATE:           4/20/95
        DAY:            THURSDAY
        TIME:           5:00 PM - 6:00 PM
        DURATION:       1 HOUR OR LESS
        REASON:         CHECK COILS
        EFFECT:         VENTILATION SERVING NW21 WILL BE DOWN FOR LESS
                        THAN 1 HOUR, APPROXIMATELY 15 MINUTES


home help back first fref pref prev next nref lref last post