[27971] in Hotline Meeting
SHUTDOWNS BLDG E17, E34, NW21
daemon@ATHENA.MIT.EDU (OPCTEMP%MITPPL.BITNET@mitvma.mit.e)
Thu Apr 20 13:57:34 1995
Date: Thu, 20 Apr 1995 13:54 EDT
From: OPCTEMP%MITPPL.BITNET@mitvma.mit.edu
To: DCARLSON@MIT.EDU, CAPPUCCI@MIT.EDU, SHUTDOWNS@MIT.EDU, OPSNOTE@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, OPSNOTE@MIT.EDU,
SDVERIFY@MIT.EDU, SHUTDOWNS@MIT.EDU
X-Vms-To:
IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU",IN%"SHUTDOWNS@MIT.EDU",IN%"OPSNOTE@
MIT.EDU"
THE FOLOWING ARE THREE ADDITIONAL SHUTDOWNS
ROUTINE
BLDG: E17
SYSTEM: ELECTRICAL POWER TO 480 VOLT FAN MOTOR CONTROL
CENTER
DATE: 4/21/95
DAY: FRIDAY
TIME: 6:30 AM - 8:30 AM
DURATION: 2 HOURS
REASON: CONSTRUCTION
EFFCT: POWER TO CONTROL CENTER WILL BE DOWN, NO EFFECT
TO BULIDING OCCUPANTS. SHUTDOWN OCCURING IN
CONSTRUCTION PORTION OF BLDG
BLDG: E34
SYSTEM: HEATED HOT WATER
DATE: 4/21/95
DAY: FRIDAY
TIME: 7:30 AM - 12:00 PM
DURATION: 4.5 HOURS
REASON: REPAIR
EFFECT: NO HEATED HOT WATER TO BLDG E34
CRITICAL
BLDG: NW21
SYSTEM: AIR HANDLER 1
DATE: 4/20/95
DAY: THURSDAY
TIME: 5:00 PM - 6:00 PM
DURATION: 1 HOUR OR LESS
REASON: CHECK COILS
EFFECT: VENTILATION SERVING NW21 WILL BE DOWN FOR LESS
THAN 1 HOUR, APPROXIMATELY 15 MINUTES