RE:Power outage

daemon@ATHENA.MIT.EDU (jjmorey@MIT.EDU)
Thu Jan 19 06:45:09 1995

From: jjmorey@MIT.EDU
To: shutdowns@MIT.EDU
Date: Thu, 19 Jan 1995 06:45:02 EST


------- Forwarded Message

Received: from MIT.MIT.EDU by po8.MIT.EDU (5.61/4.7) id AA14468; Wed, 18 Jan 95 15:43:43 EST
Received: from PLANT51.MIT.EDU by MIT.EDU with SMTP
	id AA15918; Wed, 18 Jan 95 15:42:51 EST
Message-Id: <9501182042.AA15918@MIT.EDU>
Date: Wed, 18 Jan 95 16:50:20
From: sirianni@MIT.EDU (Vicky Sirianni)
To: plant-notify@MIT.EDU
Subject: Cause of Outage 1/18/95
Cc: wrd@MIT.EDU

For your information - 

In the process of removing obsolete cables in one of our manholes,
a contractor mistakenly cut into a live 13.8 Kv Cable.  Miraculously he 
was not injured, but the system, as would be expected, shut down and the 
switches all opened instantaneously.  We were able to restore power
within 45 minutes to all the affected buildings with the exception of 
Building 16.  We are splicing (reparing) the cable right now, but in an 
attempt to keep research going in 16 as much as possible, we are feeding 
the basement lighting and mechanical equipment and the 2nd, 3rd and 8th 
floor laboratory spaces from an alternate source.  We expect to restore 
all the power to Building 16 at approximately 11:00 PM this evening.

We apologize for the inconvenience and disruption this outage caused,
but considering the gravity of the situation, it could have been a 
great deal worse.

Thank you,

V. V. Sirianni
Director