[26468] in Hotline Meeting
[VP] Boiler reduced capacity
daemon@ATHENA.MIT.EDU (jjmorey@MIT.EDU)
Tue Jan 17 14:24:07 1995
From: jjmorey@MIT.EDU
To: shutdowns@MIT.EDU
Date: Tue, 17 Jan 1995 14:23:54 EST
------- Forwarded Message
Received: from PACIFIC-CARRIER-ANNEX.MIT.EDU by po8.MIT.EDU (5.61/4.7) id AA23988; Tue, 17 Jan 95 14:11:06 EST
Received: from MITVMA.MIT.EDU by MIT.EDU with SMTP
id AA21320; Tue, 17 Jan 95 14:10:31 EST
Received: from MITVMA.MIT.EDU by mitvma.mit.edu (IBM VM SMTP V2R2)
with BSMTP id 3659; Tue, 17 Jan 95 14:10:28 EST
Received: from MITPPL.BITNET (NJE origin MTOBIN@MITPPL) by MITVMA.MIT.EDU
(LMail V1.2a/1.8a) with BSMTP id 6887; Tue, 17 Jan 1995 14:10:28 -0500
Received: from MITPPL.BITNET by MITPPL.BITNET (PMDF #12255) id
<01HLYF5LRSRK8WY601@MITPPL.BITNET>; Tue, 17 Jan 1995 14:11 EDT
Date: Tue, 17 Jan 1995 14:11 EDT
From: MTOBIN%MITPPL.BITNET@mitvma.mit.edu
Subject: Power Plant Boilers
To: plant-notify@MIT.EDU
Message-Id: <01HLYF5LRSRK8WY601@MITPPL.BITNET>
X-Envelope-To: plant-notify@mit.edu
X-Vms-To: IN%"plant-notify@mit.edu"
X-Vms-Cc: MTOBIN
This is to notify you that Power Plant boilers are running at
reduced capacity. Steam pressure has diminished dramatically and chilled
water temperatures are elevated. We are in the process of shedding load on
those areas that are not critical so that we can provide better service
to those areas that are.
Expect chilled water temperatures to remain elevated until at
least 3:30 pm.
As the situation develops, I will provide further updates.
Mary Tobin, Supervisor
Physical Plant
Operations Center
------- End of Forwarded Message