[26278] in Hotline Meeting
14-0637 sched for lighting replacement ...
daemon@ATHENA.MIT.EDU (rdshydur@MIT.EDU)
Wed Jan 4 11:00:38 1995
From: rdshydur@MIT.EDU
To: hotline@MIT.EDU
Cc: maryam@MIT.EDU, rdshydur@MIT.EDU
Date: Wed, 04 Jan 1995 11:00:15 EST
good morning lou, et al-
the notice mentioned taking precautions to prevent
damages, etc in rooms being worked in (this week?).
i'd like to mention that who-ever has done refittings,
installations in 14-0637 didn't clean up after themselves
last time (replacement of projection screen, for example;
electrical work including drilling into concrete ceiling
above barco).
this work has resulted in concrete dust and paint
particles settling on equipment and desk and table tops.
encouring/requiring effectors of such fallout to cover
equipment (especially the printer!) with (clean) tarps
should be considered.
covering equipment also suggests shutting down (heat).
a close look at the current fallout on the printer
leads me to think the a/c filters also need replacing.
just making a few suggestions, i am, hastily, but sincerely,
- r
.