[24255] in Hotline Meeting
Trouble Call B 38 Cluster/ B 33 Remove thin drops
daemon@ATHENA.MIT.EDU (sgoldman@tcm.mit.edu)
Thu Sep 15 07:26:31 1994
To: trans-trb@MIT.EDU, dcns-cluster@MIT.EDU, hotline@MIT.EDU
Cc: net-info@MIT.EDU
Date: Thu, 15 Sep 94 07:25:13 -0400
From: sgoldman@tcm.mit.edu
Jerry,
Thanks for the info on Building 38-
Building 33-222. Tom Coppeto sent over a work order to
install two quads in 33-222, signed by Lorraine. It appears your
group was not informed. Help Log 8693. The jacks are going in this
morning. Currently, there is a four port thin wire repeater supporting
drops in the area. It appears the quads will support these machines
once installed. I'm planning on removing the thin wire repeater and
installing a 12 port utp repeater to support the entire room. Currently
utp drops in that area are supported from the fourth floor.
I will wait and coordinate with your group.
------- Forwarded Message
Return-Path: burke@MIT.EDU
Received: from BIGREDONE.MIT.EDU by MIT.EDU with SMTP
id AA05771; Wed, 14 Sep 94 16:56:52 EDT
Message-Id: <9409142056.AA05771@MIT.EDU>
Date: Wed, 14 Sep 94 17:00:50
From: burke@MIT.EDU (Jerry Burke)
To: Stephen B.Goldman <sgoldman>
Subject: Re: Building 38 Cluster, Remove thin drop 33-222
Cc: dcns-cluster@MIT.EDU
> To: dcns-cluster@MIT.EDU, hotline@MIT.EDU
> Cc: trans-trb@MIT.EDU
> Subject: Building 38 Cluster, Remove thin drop 33-222
> From: Stephen B.Goldman <sgoldman@tcm.mit.edu>
> Date: Wed, 14 Sep 94 14:38:16 -0400
> Sender: sgoldman@tcm.mit.edu
> X-Mts: smtp
>
Hi Steve,
I talked to Mohammad this morning, he could not find anything wrong with
the new Asante installation. I believe this is in Ron or Toms court now,
becuase the newtrok is unusually slow. JJ and John have been out of the
loop, all they do is deliver the systems and try to test them, if they
don't test there is not much they can do. Net-help sent mail yesterday
asking for help. Mohammad called and doesn't see a problem, yet we cannot
do the things we normally can do in our clusters.
Jerry
>
> John Chase / JJ,
> Could you give me a call about the status
> of Building 38 ? Do we need to return the repeaters we
> removed or what to solve the packet loss problem?
>
> Let's get together and make a plan.
>
> Secondly,
>
> I have a work order to provide two quad drops
> in 33-222. At that time I will be removing the thin
> wire repeater. Could you offer a hand moving over between
> thin to aui?
We can if it pertains to Athena. Let us know, if you just need help
becuasse you need help let us know. We can work something out. This room is
not on our agenda, do you know someting we don't?
Thanks, Jerry
>
>
>
>
>
>
>
>
>
> Thank You,
> Stephen Goldman
------- End of Forwarded Message