[23619] in Hotline Meeting

home help back first fref pref prev next nref lref last post

[VP] Bldg. E52 shutdown

daemon@ATHENA.MIT.EDU (John J Morey)
Tue Aug 2 15:11:03 1994

To: shutdowns@MIT.EDU
Date: Tue, 02 Aug 1994 15:10:55 EDT
From: John J Morey <jjmorey@MIT.EDU>


------- Forwarded Message

Received: from MIT.MIT.EDU by po7.MIT.EDU (5.61/4.7) id AA17233; Tue, 2 Aug 94 14:48:22 EDT
Received: from TCM-MAC-12.MIT.EDU by MIT.EDU with SMTP
	id AA05966; Tue, 2 Aug 94 14:48:09 EDT
Message-Id: <9408021848.AA05966@MIT.EDU>
Date: Tue, 02 Aug 94 14:55:29
From: dmprevit@MIT.EDU (Donna M. Previte)
To: opsnote@MIT.EDU, telecom-duty@MIT.EDU, nethelp@MIT.EDU
Subject: Electric Power Shutdown
Cc: 5help@MIT.EDU, mtobin%mitppl@mitvma.mit.edu

The following notice has been received today:

ELECTRIC POWER

Date:  Saturday, August 13th
Time:  8:00AM - 4:00PM
Locations:  E52, 4th floor rooms. - 401, 403, 466, 467, 469 & 431.
Reason for shutdown:  To replace electric panels.

Please note that the following wire closets are located in this area: 
E52-414T and E52-471T.

Donna Previte
Telecom Repair Help Desk

------- End of Forwarded Message


home help back first fref pref prev next nref lref last post