| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
To: shutdowns@MIT.EDU Date: Tue, 02 Aug 1994 08:24:01 EDT From: John Chase <jchase@MIT.EDU> w20-575a, PM on fan coil unit, reduced cooling, backup wil be running. original time was 4am -7am. I asked to hold and reschedule for a 8am starting time. Bill from Phy Plant will call back with a rescheduled time. --john c 8-2 8:24am
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |