Original schedule:

*NOTE:  There will be an electrical power shutdown scheduled for 16 &
26 only and is scheduled for Sat., 7/23 & Mon., 7/25.  They are both
scheduled to begin at 2 am, and will last for 1/2 hour each.  In addition
to the power, some mechanical equipment may or may not be affected.
However, the scope of this shutdown is being investigated and will
follow the normal shutdown procedure.

---------------->

Pp called to say that the schedule just for these two locations have been push
back to sunday 7/24 from 1:00-3:00am instead of monday 7/25.

The rest of locations will go as planned.