| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
From: larugsi@MIT.EDU
To: hotline@MIT.EDU
Date: Tue, 19 Jul 94 18:24:05 EDT
These sun systems were reported with no power.
M4-167-2 had a loose keybd cable at the keybd end. Have power cycled. Now
back up and operating properly.
M4-167-9 Needed to be power cycled. This may have been due to the power hit
late this afternoon. Now back up and operating properly.
--Lou 7/19/94
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |