Hi all,
      At approx 19:00 I was notified by P.P. that they received the alarm
from the primary A/C unit. I have responded to find P.P. present at this 
location with the audible sounding. I have reset the alarm. The primary unit
is constantly failing with high humidity alarms, and will not stay up. A
priority work order (673558) is now opened for Warren Scott for the a.m. In the
meanwhile, the secondary A/C unit is running, and will be monitored throughout
the evening. This issue needs to be followed up on in the a.m.