Switching Power Back:

daemon@ATHENA.MIT.EDU (larugsi@MIT.EDU)
Wed Mar 23 17:54:46 1994

From: larugsi@MIT.EDU
To: op@MIT.EDU, network@MIT.EDU
Cc: hotline@MIT.EDU, dcns-cluster@MIT.EDU
Date: Wed, 23 Mar 94 17:54:35 EST

I was paged by P.P. at approx. 4:40 pm and was told that power will be 
switched back at 7:00pm this evening. The Bldg's involved were listed as 
follows:          26,18,8,6B,14,50,62,13,9,31,35,37, and 7.
Carlton was contacted by Nina, from the Hayden Library area, asking if we
could shut here machines down. Carlton and I have taken care of this issue.
                             --Lou  3/23/94               