[2022] in Hotline Meeting
M11-116-10
daemon@ATHENA.MIT.EDU (larugsi@ATHENA.MIT.EDU)
Thu Oct 11 19:48:34 1990
From: larugsi@ATHENA.MIT.EDU
To: hotline@ATHENA.MIT.EDU
Cc: murman@ATHENA.MIT.EDU, cc@ATHENA.MIT.EDU, carlton@ATHENA.MIT.EDU,
Date: Thu, 11 Oct 90 19:48:03 EDT
Carlton has come up with a replacement keyboard for the above mentioned
system that was involved in a flood situation over the Columbus holiday
weekend.
John Doherty has checked with Physical Plant in regards to the replacement
ceiling panels involved in the flood. A work order has been issued, and these
ceiling panels have been ordered. Thanks John..
--Lou