[186782] in Hotline Meeting
**Extended** Approved Bldg. N16 - Loading Dock Dry Sprinkler System
daemon@ATHENA.MIT.EDU (William J Lombard)
Thu Aug 25 12:00:47 2016
From: William J Lombard <wjlombar@mit.edu>
To: shutdown-fyi <shutdown-fyi@mit.edu>, Jon Sepich <jsepich@mit.edu>,
rm-wcs
<rm-wcs@mit.edu>, shutdowns <shutdowns@mit.edu>,
Billy Homeyer
<whomeyer@mit.edu>, rm-shutdown <rm-shutdown@mit.edu>,
cp-command
<cp-command@mit.edu>, safety <safety@mit.edu>,
dof-operators
<dof-operators@mit.edu>, dof-csc <dof-csc@mit.edu>,
rm-fire-prot-team
<rm-fire-prot-team@mit.edu>,
Karen E Semerjian <ksemerj@mit.edu>,
"Eupremio
S Piccinonno" <eupremio@mit.edu>,
Mike DeRoche <mderoche@mit.edu>,
Bernadette
T Drinkwater <bdrink@mit.edu>
CC: William J Lombard <wjlombar@mit.edu>,
"'Jesse Conklin'
(jconklin@bondbrothers.com)" <jconklin@bondbrothers.com>
Date: Thu, 25 Aug 2016 16:00:33 +0000
Message-ID: <0DC219FAC1620B468DD07F6A9FBB4A9C3166F2CE@OC11expo28.exchange.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_0DC219FAC1620B468DD07F6A9FBB4A9C3166F2CEOC11expo28excha_"
MIME-Version: 1.0
--_000_0DC219FAC1620B468DD07F6A9FBB4A9C3166F2CEOC11expo28excha_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
This shutdown has been extended to Friday, August 26, 2016 from 8am to 2pm.=
Thank you for your patience.
The following Dry Sprinkler System shutdown notification for Bldg. N16 - Lo=
ading Dock on Thursday, August 25, 2016 from 6am to 2pm, and Friday, August=
26, 2016 8am to 2pm is for your information. No response required to this =
notification. Any question please contact Jesse Conklin @ 2-2330.
We appreciate your patience while the repairs/renovations are in progress.
Thank you
Bill Lombard
Repair & Maintenance
617-324-7705
Type: Normal
Date: August 25, 2016
Day: Thursday
Time: 6am - 2pm
Building(s): N16
Room(s): Loading Dock
System: Dry Sprinkler System
Duration: 8 hours
Reason:
To Add (2) Sprinkler Heads Below New Supply Fan/Ductwork
Effect:
Loss of the Dry Sprinkler System for duration of the shutdown
--_000_0DC219FAC1620B468DD07F6A9FBB4A9C3166F2CEOC11expo28excha_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40">
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Word 14 (filtered medium)">
<style><!--
/* Font Definitions */
@font-face
{font-family:Calibri;
panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
{margin:0in;
margin-bottom:.0001pt;
font-size:12.0pt;
font-family:"Times New Roman","serif";}
a:link, span.MsoHyperlink
{mso-style-priority:99;
color:blue;
text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
{mso-style-priority:99;
color:purple;
text-decoration:underline;}
p
{mso-style-priority:99;
mso-margin-top-alt:auto;
margin-right:0in;
mso-margin-bottom-alt:auto;
margin-left:0in;
font-size:12.0pt;
font-family:"Times New Roman","serif";}
span.EmailStyle17
{mso-style-type:personal-compose;
font-family:"Calibri","sans-serif";
color:windowtext;}
.MsoChpDefault
{mso-style-type:export-only;
font-family:"Calibri","sans-serif";}
@page WordSection1
{size:8.5in 11.0in;
margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]-->
</head>
<body lang=3D"EN-US" link=3D"blue" vlink=3D"purple">
<div class=3D"WordSection1">
<p><b>This shutdown has been extended to Friday, August 26, 2016 from 8am t=
o 2pm. Thank you for your patience.<o:p></o:p></b></p>
<p>The following Dry Sprinkler System shutdown notification for Bldg. N16 -=
Loading Dock on Thursday, August 25, 2016 from 6am to 2pm, and Friday, Aug=
ust 26, 2016 8am to 2pm is for your information. No response required to th=
is notification. Any question please
contact Jesse Conklin @ 2-2330.<o:p></o:p></p>
<p>We appreciate your patience while the repairs/renovations are in progres=
s.<o:p></o:p></p>
<p>Thank you<o:p></o:p></p>
<p>Bill Lombard<o:p></o:p></p>
<p>Repair & Maintenance<o:p></o:p></p>
<p>617-324-7705<o:p></o:p></p>
<p class=3D"MsoNormal">Type: Normal<br>
Date: August 25, 2016<br>
Day: Thursday<br>
Time: 6am - 2pm<br>
Building(s): N16<br>
Room(s): Loading Dock<br>
System: Dry Sprinkler System<br>
Duration: 8 hours<br>
Reason: <br>
To Add (2) Sprinkler Heads Below New Supply Fan/Ductwork<br>
<br>
Effect: <br>
Loss of the Dry Sprinkler System for duration of the shutdown<span style=3D=
"font-size:11.0pt;font-family:"Calibri","sans-serif""><=
o:p></o:p></span></p>
</div>
</body>
</html>
--_000_0DC219FAC1620B468DD07F6A9FBB4A9C3166F2CEOC11expo28excha_--