[186272] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Approved Bldg. 32 - All, Fire Alarm Shutdown and *Live Audible

daemon@ATHENA.MIT.EDU (Amy Chioccola)
Tue Mar 29 14:48:20 2016

From: Amy Chioccola <amychamb@mit.edu>
To: Michael W Foley <mwf@mit.edu>, Lianne E Scott <liscott@mit.edu>,
        "Michael
 Myers" <myersm@mit.edu>,
        "jackc@csail.mit.edu" <jackc@CSAIL.MIT.EDU>,
        "steverug@csail.mit.edu" <steverug@CSAIL.MIT.EDU>,
        "steverug@csail.mit.edu"
	<steverug@CSAIL.MIT.EDU>,
        Lisa A Bella <isabell@mit.edu>, Karl K Berggren
	<berggren@mit.edu>,
        Ruth T Davis <rtdavis@mit.edu>,
        "mfahie@plant.mit.edu"
	<mfahie@plant.mit.edu>,
        rm-mcs <rm-mcs@mit.edu>,
        "mobrien@plant.mit.edu"
	<MOBRIEN@plant.mit.edu>,
        cust-staff <cust-staff@mit.edu>, csg-all
	<csg-all@mit.edu>,
        Dennis Collins <colins@mit.edu>, Brian E Jones
	<jonesb@mit.edu>,
        dwright <dwright@mit.edu>, mitac-office
	<mitac-office@mit.edu>,
        Thomas J Rosko <rosko@mit.edu>, Michael A Smith
	<masmith@mit.edu>,
        Mary K Grenham <edel@mit.edu>,
        Stefanie E Hanlon-DuBois
	<shanlon@mit.edu>,
        Lawrence R Brutti <lrbrutti@mit.edu>,
        Robynn Cruz-Walker
	<rcruz@mit.edu>, Andy Neely <aneely@mit.edu>,
        schedules <schedules@mit.edu>, Karen Donaher <kdonaher@mit.edu>,
        Kathy Kasabula <kasabula@mit.edu>,
        "Rachel
 Pittari" <rpittari@mit.edu>,
        "rwong@brighthorizons.com"
	<rwong@brighthorizons.com>,
        Ronnie Mae Weiss <rmweiss@mit.edu>, shutdowns
	<shutdowns@mit.edu>,
        shutdown-response <shutdown-response@mit.edu>,
        rm-shutdown <rm-shutdown@mit.edu>, cp-command <cp-command@mit.edu>,
        safety
	<safety@mit.edu>, dof-operators <dof-operators@mit.edu>,
        dof-csc
	<dof-csc@mit.edu>, cust-staff <cust-staff@mit.edu>
CC: Billy Homeyer <whomeyer@mit.edu>, Silas Keenan <silask@mit.edu>
Date: Tue, 29 Mar 2016 18:48:05 +0000
Message-ID: <5D3B80144603274BA8C8BC8A608883E398E02B2E@OC11EXPO32.exchange.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_5D3B80144603274BA8C8BC8A608883E398E02B2EOC11EXPO32excha_"
MIME-Version: 1.0

--_000_5D3B80144603274BA8C8BC8A608883E398E02B2EOC11EXPO32excha_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following approved fire alarm shutdown and *live audible testing reques=
t for Bldg. 32 - all, on Wednesday, March 24, 2016, from 10:00am - 4:00pm, =
, with *live audible testing on Friday, March 25, 2016 through Thursday, Ma=
rch 31, 2016 (except Sunday, 03/27)from 4:30am - 7:30am, is for your inform=
ation.  Any questions, please contact Billy Homeyer, x8-0432.

Thank you,

Amy Chamberlain-Chioccola
Comprehensive Stewardship Group
Dept. of Facilities
x5-4164


Type: Normal
Date: March 24, 2016
Day: Thursday
Time: 10:00am - 4:00pm/4:30am - 7:30am
Building(s): 32
Room(s): All
System: Fire Alarm and *Live Audible Testing
Duration: 6 Hours/3 Hours
Reason:
(original)
We request bldg 32 fire alarm shutdowns on Thursday, Friday and Saturday, M=
arch 24th, 25th and 26th, 2016 as follows;

from 10 AM to 4 PM on Thurs 3/24 (follows 4-glass shop) and from 6 AM to 4 =
PM on Fri 3/25 for Simplex (Rich Perron 781-603-7799)/JME to add a speaker =
circuit and a strobe circuit to the bsmt fire alarm node and to install pro=
cessor chips to upgrade five other nodes in order to increase the bldg's fi=
re alarm traffic flow. And, also - (w/Schneider Electric/JM Electric) to ti=
e-in, program and test a new P1 CO gas detection system. We will conduct so=
me intermittent *live testing of the bldg 32 fire alarm system between 6 an=
d 7:30 AM on Friday 3/25*;

and from 6 AM to 4 PM on Sat 3/26 to conduct *live audible NFPA required 1s=
t party testing of the bldg 32 fire alarm system between 6 AM and 9 AM and =
then 12 noon to 4 PM* in order to 100% test the bsmt node, gas detection sy=
stem and 10% test the five upgraded nodes

all as part of the 32-P1 CSG Offices build-out project. Silas Keenan 4-7230=
 is the MIT project manager.

Note, the fire alarm system works thru all this (in case of an actual emerg=
ency).

(Modified)
Dear all, I need to modify and extend this bldg 32 shutdown;

1)      all shutdowns (Fri/Sat/Mon-Fri) will begin at 5:30 AM to guarantee =
testing before 6 AM;
2)      on Saturday, 3/26 we can only live test until 8:45 AM due to CAC ev=
ents taking place and beginning at 9 AM. Silent testing will follow on Satu=
rday until 4 PM or earlier.
3)      I need to request additional bldg 32 fire alarm shutdowns; from  5:=
30 AM to 7:30 AM on Monday thru Friday, March 28th, 2016 for *live audible =
1st party testing of the bldg 32 fire alarm system between 5:30 AM and 7:30=
 AM*and to begin 3rd party testing once the 1st party is complete (100% tes=
t of the bsmt node and 10% test of the other 5 upgraded nodes).

(Modification 2)
Dear all, I need to modify this bldg 32-all fire alarm shutdown's start tim=
e to 4:30 AM on Wednesday and Thursday, March 30th and 31st .
Friday's 4/1 shutdown won't be needed and is cancelled/can be taken off the=
 schedule.
At the request of MIT DAPER, MIT Fire will disable most of the speakers in =
the 1st floor gym/locker rooms during testing. Any required  testing in the=
 gym will take place prior to opening at 5:30 AM.


Effect:
Loss of fire alarms and *live audible testing for the duration of the shutd=
own.


--_000_5D3B80144603274BA8C8BC8A608883E398E02B2EOC11EXPO32excha_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40">
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Word 14 (filtered medium)">
<style><!--
/* Font Definitions */
@font-face
	{font-family:Calibri;
	panose-1:2 15 5 2 2 2 4 3 2 4;}
@font-face
	{font-family:Tahoma;
	panose-1:2 11 6 4 3 5 4 4 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
	{margin:0in;
	margin-bottom:.0001pt;
	font-size:11.0pt;
	font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
	{mso-style-priority:99;
	color:blue;
	text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
	{mso-style-priority:99;
	color:purple;
	text-decoration:underline;}
p.MsoAcetate, li.MsoAcetate, div.MsoAcetate
	{mso-style-priority:99;
	mso-style-link:"Balloon Text Char";
	margin:0in;
	margin-bottom:.0001pt;
	font-size:8.0pt;
	font-family:"Tahoma","sans-serif";}
span.BalloonTextChar
	{mso-style-name:"Balloon Text Char";
	mso-style-priority:99;
	mso-style-link:"Balloon Text";
	font-family:"Tahoma","sans-serif";}
span.EmailStyle19
	{mso-style-type:personal;
	font-family:"Calibri","sans-serif";
	color:windowtext;}
span.EmailStyle20
	{mso-style-type:personal;
	font-family:"Calibri","sans-serif";
	color:windowtext;}
span.EmailStyle21
	{mso-style-type:personal-reply;
	font-family:"Calibri","sans-serif";
	color:windowtext;}
.MsoChpDefault
	{mso-style-type:export-only;
	font-size:10.0pt;}
@page WordSection1
	{size:8.5in 11.0in;
	margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
	{page:WordSection1;}
/* List Definitions */
@list l0
	{mso-list-id:2064979725;
	mso-list-type:hybrid;
	mso-list-template-ids:-119360266 67698705 67698713 67698715 67698703 67698=
713 67698715 67698703 67698713 67698715;}
@list l0:level1
	{mso-level-text:"%1\)";
	mso-level-tab-stop:none;
	mso-level-number-position:left;
	text-indent:-.25in;}
@list l0:level2
	{mso-level-number-format:alpha-lower;
	mso-level-tab-stop:none;
	mso-level-number-position:left;
	text-indent:-.25in;}
@list l0:level3
	{mso-level-number-format:roman-lower;
	mso-level-tab-stop:none;
	mso-level-number-position:right;
	text-indent:-9.0pt;}
@list l0:level4
	{mso-level-tab-stop:none;
	mso-level-number-position:left;
	text-indent:-.25in;}
@list l0:level5
	{mso-level-number-format:alpha-lower;
	mso-level-tab-stop:none;
	mso-level-number-position:left;
	text-indent:-.25in;}
@list l0:level6
	{mso-level-number-format:roman-lower;
	mso-level-tab-stop:none;
	mso-level-number-position:right;
	text-indent:-9.0pt;}
@list l0:level7
	{mso-level-tab-stop:none;
	mso-level-number-position:left;
	text-indent:-.25in;}
@list l0:level8
	{mso-level-number-format:alpha-lower;
	mso-level-tab-stop:none;
	mso-level-number-position:left;
	text-indent:-.25in;}
@list l0:level9
	{mso-level-number-format:roman-lower;
	mso-level-tab-stop:none;
	mso-level-number-position:right;
	text-indent:-9.0pt;}
ol
	{margin-bottom:0in;}
ul
	{margin-bottom:0in;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]-->
</head>
<body lang=3D"EN-US" link=3D"blue" vlink=3D"purple">
<div class=3D"WordSection1">
<p class=3D"MsoNormal">The following approved fire alarm shutdown and *live=
 audible testing request for Bldg. 32 - all, on Wednesday, March 24, 2016, =
from 10:00am - 4:00pm, , with *live audible testing on Friday, March 25, 20=
16 through Thursday, March 31, 2016
 (except Sunday, 03/27)from 4:30am &#8211; 7:30am, is for your information.=
&nbsp; Any questions, please contact Billy Homeyer, x8-0432.<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Thank you,<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Amy Chamberlain-Chioccola<o:p></o:p></p>
<p class=3D"MsoNormal">Comprehensive Stewardship Group<o:p></o:p></p>
<p class=3D"MsoNormal">Dept. of Facilities<o:p></o:p></p>
<p class=3D"MsoNormal">x5-4164<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Type: Normal<o:p></o:p></p>
<p class=3D"MsoNormal">Date: March 24, 2016<o:p></o:p></p>
<p class=3D"MsoNormal">Day: Thursday<o:p></o:p></p>
<p class=3D"MsoNormal">Time: 10:00am - 4:00pm/4:30am &#8211; 7:30am<o:p></o=
:p></p>
<p class=3D"MsoNormal">Building(s): 32<o:p></o:p></p>
<p class=3D"MsoNormal">Room(s): All<o:p></o:p></p>
<p class=3D"MsoNormal">System: Fire Alarm and *Live Audible Testing<o:p></o=
:p></p>
<p class=3D"MsoNormal">Duration: 6 Hours/3 Hours<o:p></o:p></p>
<p class=3D"MsoNormal">Reason: <o:p></o:p></p>
<p class=3D"MsoNormal">(original)<o:p></o:p></p>
<p class=3D"MsoNormal">We request bldg 32 fire alarm shutdowns on Thursday,=
 Friday and Saturday, March 24th, 25th and 26th, 2016 as follows;
<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">from 10 AM to 4 PM on Thurs 3/24 (follows 4-glass sh=
op) and from 6 AM to 4 PM on Fri 3/25 for Simplex (Rich Perron 781-603-7799=
)/JME to add a speaker circuit and a strobe circuit to the bsmt fire alarm =
node and to install processor chips
 to upgrade five other nodes in order to increase the bldg's fire alarm tra=
ffic flow. And, also - (w/Schneider Electric/JM Electric) to tie-in, progra=
m and test a new P1 CO gas detection system. We will conduct some intermitt=
ent *live testing of the bldg 32
 fire alarm system between 6 and 7:30 AM on Friday 3/25*; <o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">and from 6 AM to 4 PM on Sat 3/26 to conduct *live a=
udible NFPA required 1st party testing of the bldg 32 fire alarm system bet=
ween 6 AM and 9 AM and then 12 noon to 4 PM* in order to 100% test the bsmt=
 node, gas detection system and 10%
 test the five upgraded nodes <o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">all as part of the 32-P1 CSG Offices build-out proje=
ct. Silas Keenan 4-7230 is the MIT project manager.<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Note, the fire alarm system works thru all this (in =
case of an actual emergency).<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">(Modified)<o:p></o:p></p>
<p class=3D"MsoNormal">Dear all, I need to modify and extend this bldg 32 s=
hutdown;
<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal" style=3D"margin-left:.5in;text-indent:-.25in;mso-lis=
t:l0 level1 lfo2">
<![if !supportLists]><span style=3D"mso-list:Ignore">1)<span style=3D"font:=
7.0pt &quot;Times New Roman&quot;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
</span></span><![endif]>all shutdowns (Fri/Sat/Mon-Fri) will begin at 5:30 =
AM to guarantee testing before 6 AM;<o:p></o:p></p>
<p class=3D"MsoNormal" style=3D"margin-left:.5in;text-indent:-.25in;mso-lis=
t:l0 level1 lfo2">
<![if !supportLists]><span style=3D"mso-list:Ignore">2)<span style=3D"font:=
7.0pt &quot;Times New Roman&quot;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
</span></span><![endif]>on Saturday, 3/26 we can only live test until 8:45 =
AM due to CAC events taking place and beginning at 9 AM. Silent testing wil=
l follow on Saturday until 4 PM or earlier.
<o:p></o:p></p>
<p class=3D"MsoNormal" style=3D"margin-left:.5in;text-indent:-.25in;mso-lis=
t:l0 level1 lfo2">
<![if !supportLists]><span style=3D"mso-list:Ignore">3)<span style=3D"font:=
7.0pt &quot;Times New Roman&quot;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
</span></span><![endif]>I need to request additional bldg 32 fire alarm shu=
tdowns; from &nbsp;5:30 AM to 7:30 AM on Monday thru Friday, March 28<sup>t=
h</sup>, 2016 for *live audible 1<sup>st</sup> party testing of the bldg 32=
 fire alarm system between 5:30 AM and
 7:30 AM*and to begin 3<sup>rd</sup> party testing once the 1<sup>st</sup> =
party is complete (100% test of the bsmt node and 10% test of the other 5 u=
pgraded nodes).
<o:p></o:p></p>
<p class=3D"MsoNormal"><b><o:p>&nbsp;</o:p></b></p>
<p class=3D"MsoNormal"><b>(Modification 2)<o:p></o:p></b></p>
<p class=3D"MsoNormal"><b>Dear all, I need to modify this bldg 32-all fire =
alarm shutdown&#8217;s start time to 4:30 AM on Wednesday and Thursday, Mar=
ch 30<sup>th</sup> and 31<sup>st</sup> .
<o:p></o:p></b></p>
<p class=3D"MsoNormal"><b>Friday&#8217;s 4/1 shutdown won&#8217;t be needed=
 and is cancelled/can be taken off the schedule.<o:p></o:p></b></p>
<p class=3D"MsoNormal"><b>At the request of MIT DAPER, MIT Fire will disabl=
e most of the speakers in the 1<sup>st</sup> floor gym/locker rooms during =
testing. Any required &nbsp;testing in the gym will take place prior to ope=
ning at 5:30 AM.<o:p></o:p></b></p>
<p class=3D"MsoNormal"><b><o:p>&nbsp;</o:p></b></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Effect: <o:p></o:p></p>
<p class=3D"MsoNormal">Loss of fire alarms and *live audible testing for th=
e duration of the shutdown.<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
</div>
</body>
</html>

--_000_5D3B80144603274BA8C8BC8A608883E398E02B2EOC11EXPO32excha_--

home help back first fref pref prev next nref lref last post