[185906] in Hotline Meeting
Bldg 46 - 4th Floor MIBR Wing - Lab Vacuum, Natural Gas, Compressed Lab Air, Lab Process Water , and Tempered Water Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@mit.edu)
Tue Feb 2 14:10:12 2016
From: shutdown-response@mit.edu
To: <undisclosed_recipients@mit.edu>
Cc: <dlach@mit.edu>, <whomeyer@mit.edu>, <vang@mit.edu>
Date: Tue, 2 Feb 2016 14:10:38 -0500
Message-ID: <91A572D0B5A14207A41F030C8D7E1D17@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following lab vacuum, natural gas, compressed lab air, lab process water, and tempered water shutdown request for bldg. 46 - 4th floor MIBR wing, on Thursday, February 4, 2016, and Friday, February 5, 2016, from 5:00am through 9:00am on each day, is for your information and response. Any questions please contact Billy Homeyer x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Amy Chamberlain-Chioccola
Comprehensive Stewardship Group
Dept. of Facilities
x5-4164
Type: Normal
Date: February 4, 2016
Day: Thursday
Time: 5:00am - 9:00am each day
Building(s): 46
Room(s): 4th Flr MIBR Wing
System: Lab Vacuum, Natural Gas, Compressed Lab Air, Lab Process Water , and Tempered Water
Duration: 4 Hours each day
Reason:
We would like to RESCHEDULE the bldg 46-4th floor MIBR wing lab services (Vac/NatGas/HP and lab air) shutdown and lab process water and tempered water shutdowns for lab 46-4257 as follows: lab services from 5 AM to 9 AM on Thursday, February 4th and lab process hot/cold/tempered waters from 5 AM to 9 AM on Friday, February 5th, 2016 for Dan-Cel Plumbing (Rick Donovan 508-663-8565) to install isolation valves in the horizontal mains that run thru the lab associated with the bldg 46-4257 Prof Flavell Lab renovation by Wise Construction (Chris Luong 781-389-5649. Both the shutdown request form and work order # 5393072 have been modified to reflect this change.
Effect:
Loss of lab vacuum, natural gas, compressed lab air, lab process water, and tempered water for the duration of the shutdown.